Yahoo Search Busca da Web

Resultado da Busca

  1. 9 de set. de 2009 · Completed in 2009 in Beijing, China. Images by SHU He, Iwan Baan . The 220,000 square meter pedestrian-oriented Linked Hybrid complex, sited adjacent to the site of old city wall of...

  2. LINKED HYBRID. Beijing, China 2009. Description +. PROGRAM: 644 apartments, public green space, commercial zones, hotel, cinemateque, kindergarten, Montessori school, underground parking. CLIENT: Modern Green Development Co., Ltd. Beijing. SIZE: 2,383,797 sq ft. STATUS: complete.

  3. 8 de jul. de 2009 · -- Linked Hybrid. Beijing, , China. 2003 – 2009. PROJECT TEXT. The 220,000 square-meter Linked Hybrid complex in Beijing, aims to counter the current urban developments in China by...

  4. Adjacent to the site of the old city wall of Beijing sits the 220,000 square meter Linked Hybrid complex by Steven Holl Architects. This complex was finished being built in 2009 and contains within it 750 apartments, public green space, commercial zones, a hotel, cinema, kindergarten, Montessori school, and underground parking.

    • linked hybrid do escritório steven holl projetado para beijing em 2009 china1
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china2
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china3
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china4
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china5
  5. Linked Hybrid. 1, Xiang He Yuan Lu, Dongcheng Qu, Beijing, China. Firm. Steven Holl Architects. Type. Residential › Apartment. Hospitality + Sport › Hotel. Cultural › Hall/Theater. Educational › Elementary School. Transport + Infrastructure › Parking. 2008. 1,000,000 +.

    • linked hybrid do escritório steven holl projetado para beijing em 2009 china1
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china2
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china3
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china4
    • linked hybrid do escritório steven holl projetado para beijing em 2009 china5
  6. 2009: Opening: 2009: Height; Roof: 223 ft (68 m) Technical details; Floor count: 21: Floor area: 221,426 sm: Design and construction; Architect(s) Steven Holl Architects: Structural engineer: Guy Nordenson and Associates Cosentini Associates: Main contractor: Beijing Construction Engineering Group

  7. 31 de jul. de 2015 · Published on July 31, 2015. Share. A community of 750 units interconnected on, below and above ground, Steven Holl Architects "Linked Hybrid" was an intentional shift away from the...